The UPS system must have the potential to aid the power load with the linked units plugged into it. Moreover, the continuous generator potential score have to be no less than two times the rated capacity of the UPS method.The Moi application shows power usage, time remaining, and battery position. Once the Power+ Nexus is in charging manner, the ap